Welcome To b2b168.com, Join Free | Sign In
中文(简体) |
中文(繁體) |
Francés |Español |Deutsch |Pусский |
| No.13693951

- Product Categories
- Friendly Links
- home > Supply > Industrial epoxy intermediate coat of iron corrosion resistance superior products cheap factory direct
Industrial epoxy intermediate coat of iron corrosion resistance superior products cheap factory direct
Information Name: | Industrial epoxy intermediate coat of iron corrosion resistance superior products cheap factory direct |
Published: | 2015-04-09 |
Validity: | 30 |
Specifications: | 27kg / barrel |
Quantity: | 27.00 |
Price Description: | |
Detailed Product Description: | Product characteristics when the air humidity of 94%, the still normal curing film, and the physical and chemical properties of the same film tough, strong, abrasion resistance, excellent impact resistance and painted with a good variety of complementary products Use mainly for construction and offshore platforms or cabin south high humidity areas, ballast tanks and other parts under high humidity and construction. Color Gray Construction conditions airless spray nozzle size recommended pressure 0.6 ~ 0.8mm 160 ~ 190kg / cm 2 dilution ratio 0 ~ 5% by wet. (Weight ratio) applied to conventional spray, brush and roller thinner FXH-4 The mixing ratio of the two-component epoxy diluent: the main agent / curing agent = 4/1 (weight ratio) mixed Temperature: 10 ℃ 20 ℃ 30 ℃ Pot life: 12hrs 8hrs 6hrs coating thickness of the dry film: 50μm / Road wet film: 80μm / Road solids content of 77% share of the theoretical value of 1.56 applied rate: 0.125 kg / sq m / 50μm 0.08L / square meter / 50μm actual value: and surface treatment, the external environment, construction methods, and other factors. Drying Time Temperature Tack hard work: 10 ℃ 20 ℃ 30 ℃ 1.5hrs 1.2hrs 1hrs 16hrs 11hrs 9hrs Coating interval Min Max Min largest 16hrs 11hrs 9hrs - - - storage period a year Packing component packaging:.. 27kg for a group, a component of 24kg, two components of the surface treatment of 3kg rushed with water-soluble salts and other contaminants. Remove grease in accordance with SSPC-SP1 solvent cleaning standards. With high-pressure air purge to remove dust and dirt. Sure that the surface is clean and dry before construction. Reapply after 15 days treatment is recommended for the original film nap if you have any questions please contact the company Jin Hai Tu inquiry under applicable supporting painting: Various classes zinc primer, apply the epoxy primer coat: and a variety of finishes are Construction can be matched to any paint if you have any questions please check the Jinhai company shall ensure the safety precautions provided in the following measures: Avoid contact with skin and eyes. If the paint comes into contact with skin or eyes, rinse with plenty of water and seek medical attention immediately. Ensure good ventilation. Risk of fire or explosion. Site comply with all health and safety regulations. To draw attention to the information provided in this manual are currently held by our most comprehensive and correct information, in view of product use conditions beyond our control, there is a world of information does not contain guarantees that the buyer is responsible only for the selection of products. Due to the continuous development of our products and production processes, all of which are in our confirmation message. |
Admin>>>
You are the 5313 visitor
Copyright © GuangDong ICP No. 10089450, Tianjin Hite Paint Decoration Co., Ltd. All rights reserved.
Technical support: ShenZhen AllWays Technology Development Co., Ltd.
AllSources Network's Disclaimer: The legitimacy of the enterprise information does not undertake any guarantee responsibility
You are the 5313 visitor
Copyright © GuangDong ICP No. 10089450, Tianjin Hite Paint Decoration Co., Ltd. All rights reserved.
Technical support: ShenZhen AllWays Technology Development Co., Ltd.
AllSources Network's Disclaimer: The legitimacy of the enterprise information does not undertake any guarantee responsibility