Welcome To b2b168.com, Join Free | Sign In 
中文(简体) |
中文(繁體) |
Francés |Español |Deutsch |Pусский |
 | No.13693951
 | No.13693951
- Product Categories
 
- Friendly Links
 
- home > Supply > You cheap coal tar epoxy anti-corrosion coating preservative paint ship factory direct products
 
| Information Name: | You cheap coal tar epoxy anti-corrosion coating preservative paint ship factory direct products | 
| Published: | 2015-04-09 | 
| Validity: | 30 | 
| Specifications: | |
| Quantity: | 28.00 | 
| Price Description: | |
| Detailed Product Description: | Product characteristics when the air humidity of 94%, the still normal curing film, and the physical and chemical properties of the same fast drying, with the steel after sandblasting and surface adhesion excellent abrasion resistance, excellent impact resistance coating interval is short, gas cutting and weldability superior product uses mainly for the bottom part of the container, the bottom, all kinds of underground pipes, steel products, anti-corrosion paint underground. Color black, brown construction conditions recommended by airless spray nozzle size 0.8 ~ 0.9mm pressure 100 ~ 150kg / cm 2 dilution ratio 0 ~ 5% by wet. (Weight ratio) applied to conventional spray, brush and roller thinner FXH -4 mixing ratio of two-component epoxy diluent: the main agent / curing agent = 10/1 (weight ratio) mixed Temperature: 10 ℃ 20 ℃ 30 ℃ Pot life: 10hrs 8hrs 6hrs coating thickness of the dry film: 125μm / Road wet film: 233μm / Road solids content of 72% share of the theoretical value of 1.46 applied rate: 0.28 kg / m / 125μm 0.192L / square meter / 125μm actual value: and surface treatment, the external environment, construction methods, etc. variety of factors. Drying Time Temperature Tack hard work: 10 ℃ 20 ℃ 30 ℃ 2.5hrs 2hrs 1.5hrs 18hrs 12hrs 10hrs Coating interval Min Max Min largest 18hrs 12hrs 10hrs - - - storage period a year Packing component packaging:.. 27.5kg as a group, as a component of a 25kg, 2.5kg component two for the surface treatment of the substrate temperature above -10 ℃, can be washed with water to continue construction and other water-soluble salt contamination. Remove grease in accordance with SSPC-SP1 solvent cleaning standards. With high-pressure air purge to remove dust and dirt. Confirm surface thoroughly before construction clean, dry, non-condensing. Painting under applicable supporting James: coal tar epoxy primer if you have any questions please check the Jinhai company. Any paint in construction safety precautions should ensure the following measures: Avoid contact with skin and eyes. If the paint comes into contact with skin or eyes, rinse with plenty of water and seek medical attention immediately. Ensure good ventilation. Risk of fire or explosion. Site comply with all health and safety regulations. To draw attention to the information provided in this manual are currently held by our most comprehensive and correct information, in view of product use conditions beyond our control, there is a world of information does not contain guarantees that the buyer is responsible only for the selection of products. Due to the continuous development of our products and production processes, all of which are in our confirmation message.  | 
Admin>>>
You are the 5313 visitor
Copyright © GuangDong ICP No. 10089450, Tianjin Hite Paint Decoration Co., Ltd. All rights reserved.
Technical support: ShenZhen AllWays Technology Development Co., Ltd.
AllSources Network's Disclaimer: The legitimacy of the enterprise information does not undertake any guarantee responsibility
You are the 5313 visitor
Copyright © GuangDong ICP No. 10089450, Tianjin Hite Paint Decoration Co., Ltd. All rights reserved.
Technical support: ShenZhen AllWays Technology Development Co., Ltd.
AllSources Network's Disclaimer: The legitimacy of the enterprise information does not undertake any guarantee responsibility

